Checkpoint Report
• Home • Up •

 

 

Purpose
  • To report at a frequency defined in the Stage Plan the status of work for each member of a team.
     

Contents:

  • Date Held
  • Period Covered
  • Follow-ups from Previous Reports
  • Activities during the Period
  • Products Completed during the Period
  • Quality Work carried out during the Period
  • Problems or Deviation from Plan
  • Actual
  • Potential
  • Planned Work for Next Period
  • Product Completions next Period
 
Google
 

by: www.turnerdesign.org